A program where medically qualified individuals who have medical assistance are assisted to be able to stay in their home or a least restrictive environment as long as possible by giving them better access to medical care and needed equipment, and by result, decreasing emergency room visits, hospital stays, and nursing home stays.
Objective Time-Frame Target Measure: Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac)
Objective Time-Frame Target Goal: 70
Objective Time-Frame Target Date: 2021-07-01
Measure | Target Goal | Status | Desired Trend | Contributor | January 2024 | February 2024 | March 2024 | April 2024 | May 2024 | June 2024 | July 2024 | August 2024 | September 2024 | October 2024 | November 2024 | December 2024 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac) | 70 | Active | Elaine | 88 | 80 | 69 | 67 | 68 | 71 | 80 | 78 | 79 | 84 | 73 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2023 | February 2023 | March 2023 | April 2023 | May 2023 | June 2023 | July 2023 | August 2023 | September 2023 | October 2023 | November 2023 | December 2023 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac) | 70 | Active | Elaine | 78 | 71 | 60 | 76 | 61 | 74 | 92 | 90 | 96 | 74 | 81 | 72 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2022 | February 2022 | March 2022 | April 2022 | May 2022 | June 2022 | July 2022 | August 2022 | September 2022 | October 2022 | November 2022 | December 2022 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac) | 70 | Active | Elaine | 62 | 67 | 73 | 50 | 60 | 61 | 22 | 25 | 52 | 52 | 56 | 57 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2021 | February 2021 | March 2021 | April 2021 | May 2021 | June 2021 | July 2021 | August 2021 | September 2021 | October 2021 | November 2021 | December 2021 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac) | 70 | Active | Elaine | 70 | 92 | 82 | 69 | 81 | 57 | 53 | 58 | 41 | 40 | 80 | 80 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2020 | February 2020 | March 2020 | April 2020 | May 2020 | June 2020 | July 2020 | August 2020 | September 2020 | October 2020 | November 2020 | December 2020 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac) | 70 | Active | Elaine | 48 | 26 | 11 | 40 | 25 | 33 | 15 | 35 | 47 | 67 | 67 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2019 | February 2019 | March 2019 | April 2019 | May 2019 | June 2019 | July 2019 | August 2019 | September 2019 | October 2019 | November 2019 | December 2019 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac) | 70 | Active | Elaine |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2018 | February 2018 | March 2018 | April 2018 | May 2018 | June 2018 | July 2018 | August 2018 | September 2018 | October 2018 | November 2018 | December 2018 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac) | 70 | Active | Elaine |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2017 | February 2017 | March 2017 | April 2017 | May 2017 | June 2017 | July 2017 | August 2017 | September 2017 | October 2017 | November 2017 | December 2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Percentage of Waiver/CFC Assessments completed by requested due date (Referral Log Clinic Analysis Report in PatTrac) | 70 | Active | Elaine |
Objective Time-Frame Target Measure: # of Waiver/CFC Assessments Completed (New & Redets.)
Objective Time-Frame Target Goal: 14
Objective Time-Frame Target Date: 2021-07-01
Measure | Target Goal | Status | Desired Trend | Contributor | January 2024 | February 2024 | March 2024 | April 2024 | May 2024 | June 2024 | July 2024 | August 2024 | September 2024 | October 2024 | November 2024 | December 2024 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# of Waiver/CFC Assessments Completed (New & Redets.) | 14 | Active | Increase | Elaine | 16 | 10 | 11 | 19 | 18 | 20 | 11 | 14 | 15 | 14 | 17 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2023 | February 2023 | March 2023 | April 2023 | May 2023 | June 2023 | July 2023 | August 2023 | September 2023 | October 2023 | November 2023 | December 2023 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# of Waiver/CFC Assessments Completed (New & Redets.) | 14 | Active | Increase | Elaine | 11 | 14 | 22 | 16 | 20 | 25 | 12 | 8 | 12 | 9 | 22 | 13 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2022 | February 2022 | March 2022 | April 2022 | May 2022 | June 2022 | July 2022 | August 2022 | September 2022 | October 2022 | November 2022 | December 2022 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# of Waiver/CFC Assessments Completed (New & Redets.) | 14 | Active | Increase | Elaine | 14 | 8 | 20 | 11 | 17 | 13 | 13 | 25 | 21 | 14 | 11 | 14 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2021 | February 2021 | March 2021 | April 2021 | May 2021 | June 2021 | July 2021 | August 2021 | September 2021 | October 2021 | November 2021 | December 2021 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# of Waiver/CFC Assessments Completed (New & Redets.) | 14 | Active | Increase | Elaine | 18 | 17 | 19 | 13 | 15 | 15 | 18 | 15 | 17 | 14 | 13 | 10 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2020 | February 2020 | March 2020 | April 2020 | May 2020 | June 2020 | July 2020 | August 2020 | September 2020 | October 2020 | November 2020 | December 2020 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# of Waiver/CFC Assessments Completed (New & Redets.) | 14 | Active | Increase | Elaine | 17 | 19 | 17 | 17 | 10 | 14 | 15 | 17 | 23 | 15 | 18 | 13 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2019 | February 2019 | March 2019 | April 2019 | May 2019 | June 2019 | July 2019 | August 2019 | September 2019 | October 2019 | November 2019 | December 2019 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# of Waiver/CFC Assessments Completed (New & Redets.) | 14 | Active | Increase | Elaine | 18 | 19 | 15 | 14 | 22 | 9 | 21 | 17 | 14 | 25 | 21 | 14 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2018 | February 2018 | March 2018 | April 2018 | May 2018 | June 2018 | July 2018 | August 2018 | September 2018 | October 2018 | November 2018 | December 2018 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# of Waiver/CFC Assessments Completed (New & Redets.) | 14 | Active | Increase | Elaine | 18 | 18 | 15 | 21 | 24 | 17 | 16 | 20 | 17 | 23 | 14 | 0.09 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2017 | February 2017 | March 2017 | April 2017 | May 2017 | June 2017 | July 2017 | August 2017 | September 2017 | October 2017 | November 2017 | December 2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# of Waiver/CFC Assessments Completed (New & Redets.) | 14 | Active | Increase | Elaine | 12 | 17 | 18 | 19 | 21 | 21 | 15 | 13 | 13 | 19 | 14 | 8 |
Objective Time-Frame Target Measure: Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month.
Objective Time-Frame Target Goal: 150
Objective Time-Frame Target Date: 2021-07-01
Measure | Target Goal | Status | Desired Trend | Contributor | January 2024 | February 2024 | March 2024 | April 2024 | May 2024 | June 2024 | July 2024 | August 2024 | September 2024 | October 2024 | November 2024 | December 2024 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month. | 150 | Active | 365 | 379 | 384 | 379 | 394 | 400 | 401 | 425 | 432 | 457 | 477 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2023 | February 2023 | March 2023 | April 2023 | May 2023 | June 2023 | July 2023 | August 2023 | September 2023 | October 2023 | November 2023 | December 2023 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month. | 150 | Active | 255 | 285 | 297 | 309 | 330 | 333 | 349 | 355 | 350 | 358 | 363 | 361 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2022 | February 2022 | March 2022 | April 2022 | May 2022 | June 2022 | July 2022 | August 2022 | September 2022 | October 2022 | November 2022 | December 2022 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month. | 150 | Active | 184 | 189 | 192 | 192 | 200 | 182 | 206 | 181 | 192 | 206 | 218 | 246 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2021 | February 2021 | March 2021 | April 2021 | May 2021 | June 2021 | July 2021 | August 2021 | September 2021 | October 2021 | November 2021 | December 2021 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month. | 150 | Active | 167 | 171 | 173 | 173 | 175 | 176 | 181 | 185 | 180 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2020 | February 2020 | March 2020 | April 2020 | May 2020 | June 2020 | July 2020 | August 2020 | September 2020 | October 2020 | November 2020 | December 2020 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month. | 150 | Active |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2019 | February 2019 | March 2019 | April 2019 | May 2019 | June 2019 | July 2019 | August 2019 | September 2019 | October 2019 | November 2019 | December 2019 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month. | 150 | Active |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2018 | February 2018 | March 2018 | April 2018 | May 2018 | June 2018 | July 2018 | August 2018 | September 2018 | October 2018 | November 2018 | December 2018 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month. | 150 | Active |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2017 | February 2017 | March 2017 | April 2017 | May 2017 | June 2017 | July 2017 | August 2017 | September 2017 | October 2017 | November 2017 | December 2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Number of Patients receiving C.F.C. /C.O.W. services on the last day of the month. | 150 | Active |
Objective Time-Frame Target Measure: Total Number of Nurse Monitoring VISITS Completed in the month
Objective Time-Frame Target Goal: 30
Objective Time-Frame Target Date: 2021-07-01
Measure | Target Goal | Status | Desired Trend | Contributor | January 2024 | February 2024 | March 2024 | April 2024 | May 2024 | June 2024 | July 2024 | August 2024 | September 2024 | October 2024 | November 2024 | December 2024 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Number of Nurse Monitoring VISITS Completed in the month | 30 | Active | 25 | 20 | 32 | 26 | 29 | 17 | 36 | 29 | 20 | 23 | 24 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2023 | February 2023 | March 2023 | April 2023 | May 2023 | June 2023 | July 2023 | August 2023 | September 2023 | October 2023 | November 2023 | December 2023 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Number of Nurse Monitoring VISITS Completed in the month | 30 | Active | 32 | 27 | 39 | 29 | 22 | 29 | 31 | 38 | 23 | 17 | 33 | 38 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2022 | February 2022 | March 2022 | April 2022 | May 2022 | June 2022 | July 2022 | August 2022 | September 2022 | October 2022 | November 2022 | December 2022 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Number of Nurse Monitoring VISITS Completed in the month | 30 | Active | 35 | 29 | 33 | 31 | 27 | 23 | 39 | 33 | 29 | 33 | 31 | 24 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2021 | February 2021 | March 2021 | April 2021 | May 2021 | June 2021 | July 2021 | August 2021 | September 2021 | October 2021 | November 2021 | December 2021 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Number of Nurse Monitoring VISITS Completed in the month | 30 | Active | 39 | 32 | 31 | 34 | 35 | 34 | 24 | 37 | 34 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2020 | February 2020 | March 2020 | April 2020 | May 2020 | June 2020 | July 2020 | August 2020 | September 2020 | October 2020 | November 2020 | December 2020 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Number of Nurse Monitoring VISITS Completed in the month | 30 | Active |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2019 | February 2019 | March 2019 | April 2019 | May 2019 | June 2019 | July 2019 | August 2019 | September 2019 | October 2019 | November 2019 | December 2019 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Number of Nurse Monitoring VISITS Completed in the month | 30 | Active |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2018 | February 2018 | March 2018 | April 2018 | May 2018 | June 2018 | July 2018 | August 2018 | September 2018 | October 2018 | November 2018 | December 2018 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Number of Nurse Monitoring VISITS Completed in the month | 30 | Active |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2017 | February 2017 | March 2017 | April 2017 | May 2017 | June 2017 | July 2017 | August 2017 | September 2017 | October 2017 | November 2017 | December 2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Number of Nurse Monitoring VISITS Completed in the month | 30 | Active |
Objective Time-Frame Target Measure: Waiver/CFC Nurse Monitoring UNITS Completed and billed
Objective Time-Frame Target Goal: 400
Objective Time-Frame Target Date: 2021-07-01
Measure | Target Goal | Status | Desired Trend | Contributor | January 2024 | February 2024 | March 2024 | April 2024 | May 2024 | June 2024 | July 2024 | August 2024 | September 2024 | October 2024 | November 2024 | December 2024 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waiver/CFC Nurse Monitoring UNITS Completed and billed | 400 | Active | Increase | Elaine | 263 | 218 | 289 | 237 | 308 | 168 | 353 | 311 | 231 | 269 | 268 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2023 | February 2023 | March 2023 | April 2023 | May 2023 | June 2023 | July 2023 | August 2023 | September 2023 | October 2023 | November 2023 | December 2023 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waiver/CFC Nurse Monitoring UNITS Completed and billed | 400 | Active | Increase | Elaine | 405 | 267 | 394 | 315 | 257 | 296 | 354 | 455 | 257 | 206 | 371 | 352 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2022 | February 2022 | March 2022 | April 2022 | May 2022 | June 2022 | July 2022 | August 2022 | September 2022 | October 2022 | November 2022 | December 2022 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waiver/CFC Nurse Monitoring UNITS Completed and billed | 400 | Active | Increase | Elaine | 403 | 356 | 344 | 370 | 315 | 237 | 402 | 327 | 320 | 362 | 307 | 278 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2021 | February 2021 | March 2021 | April 2021 | May 2021 | June 2021 | July 2021 | August 2021 | September 2021 | October 2021 | November 2021 | December 2021 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waiver/CFC Nurse Monitoring UNITS Completed and billed | 400 | Active | Increase | Elaine | 350 | 401 | 439 | 562.99 | 423 | 408 | 444 | 531 | 447 | 323 | 460 | 417 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2020 | February 2020 | March 2020 | April 2020 | May 2020 | June 2020 | July 2020 | August 2020 | September 2020 | October 2020 | November 2020 | December 2020 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waiver/CFC Nurse Monitoring UNITS Completed and billed | 400 | Active | Increase | Elaine | 495 | 478 | 381 | 550 | 542 | 518 | 534 | 517 | 511 | 417 | 514 | 512 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2019 | February 2019 | March 2019 | April 2019 | May 2019 | June 2019 | July 2019 | August 2019 | September 2019 | October 2019 | November 2019 | December 2019 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waiver/CFC Nurse Monitoring UNITS Completed and billed | 400 | Active | Increase | Elaine | 500 | 464 | 338 | 416 | 322 | 392 | 247 | 405 | 443 | 398 | 355 | 445 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2018 | February 2018 | March 2018 | April 2018 | May 2018 | June 2018 | July 2018 | August 2018 | September 2018 | October 2018 | November 2018 | December 2018 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waiver/CFC Nurse Monitoring UNITS Completed and billed | 400 | Active | Increase | Elaine | 485 | 225 | 306 | 372 | 570 | 604 | 592 | 475 | 478 | 572 | 475 | 648 |
Measure | Target Goal | Status | Desired Trend | Contributor | January 2017 | February 2017 | March 2017 | April 2017 | May 2017 | June 2017 | July 2017 | August 2017 | September 2017 | October 2017 | November 2017 | December 2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waiver/CFC Nurse Monitoring UNITS Completed and billed | 400 | Active | Increase | Elaine | 780 | 816 | 842 | 706 | 805 | 515 | 537 | 549 | 443 | 489 | 386 | 565 |
To assist individuals who qualify for a Nursing Facility Level of Care to be able to stay in their own homes or in the least restrictive environment with assistance, by completing their visit/starting their assessment in the most timely manner possible. The nurses will strive to meet this goal by attempting to do 14 assessment visits and 70% of those visits be completed by the due date. The timeframe for meeting this goal will be 7/1/2021.
Enlist help in contacting medical providers for medical records, in order to speed up the initial visit for the evaluations.
to achieve the goal stated above
From 2021-06-01 to 2021-07-01
What is the % of assessments that were completed by the due date and how many were completed?
Monthly goals will be met.
1. Nurses review the patient chart and notify administrative support which medical providers they need medical records requested from. 2. Administrative support contacts the providers to request records and emails/forwards them to the nurses when received. 3. When evaluation is completed and chart turned into administrative support, the reference date (date of the visit) is documented. 4. At the end of the month a report is ran and the #’s recorded, both of % of visits/assessments started by the due date, and quantity of assessments completed.
No related measure has been set yet. Please connect this Quality Improvement project to a raw data measure.
We are able to complete at least 14 assessments. However our last two months percentage of completed assessments by the due date is in the 50 % range, not our 70% goal.
In discussion with the nurses, we find that some months are harder than others. The months of June and July (August numbers are not tallied yet), we were dealing with staff time off (scheduled vacations) and also some very difficult clients who are very hard to get in touch with to schedule. (They don’t answer their phone, don’t return calls, etc., therefore delaying when we can meet with them to start their assessment). We have also had an increased number of Nurse Monitoring clients to do during the last two months, which takes time away from being able to start the assessments. We believe that we need more than a cycle of 2 months to measure outcomes. (We used June, July )
Our goal was to have 70% of assessments started by the due date. We brainstormed and realized that we actually needed to improve our tracking method. Our goal per the state is 15 working days. The dates we had set up in PatTrac was 15 calendar days, because PatTrac does not have a way to count “working” days. We just decided that a better, more accurate tracking would be to change this report and expand it to 21 calendar days, therefore more closely reflecting 15 working days. We feel that this will allow our percentage of assessments started on time to be much closer to our goal. We will plan to try this for about 6 months and see if it shows an increase in % of assessments completed on time. We plan to continue the process we have implemented and give it more time to see if it is working. Since we started this project, we also had hit a hard time period in the last few months where there were more than usual assessments due, and we have had a very hard time getting several client’s (more than usual) to call us back to schedule them. By changing our report for the month of October, our % increased from 30% to 40%.
We have a very small staff, and we receive a lot of referrals. Referrals are often not completed by the nurses by the requested due date, therefore delaying client receiving services under this program. For many months of Qualify Improvement Project # 1, we did not meet our goals. However, there were several things that attributed to that. We discovered that we were not quite accurately documenting the due date. Our computer system cannot track working days, so we changed that late in the year, from 14 working days, to 21 calendar days. In addition, one of our nurses was out for medical reasons for an extended period of time, our computers went down and we had to improvise to be able to use laptops, personal computers or tablets. Also, we have an additional issue that will affect Project # 2, that started January 1, 2022. At the end of January, beginning of February, one of our staff of 3 nurses transitioned to a different department, leaving us a staff of only two nurses, as opposed to normally having three. This will last for a few months until we are able to advertise, replace, and train that nurse. With the changes to the way we calculate days, we decided that we need more time to see if that helped us meet our goal more often, so we are continuing the same project that we did last year, with that one change.
To assist individuals who qualify for a Nursing Facility Level of Care to be able to stay in their own homes or in the least restrictive environment with assistance, by completing their visit/starting their assessment in the most timely manner possible. The nurses will strive to meet this goal by attempting monthly to do 14 assessment visits and 70% of all referrals be completed by the due date. The due date is 21 calendar days. The timeframe for meeting this goal will be 12/31/2022.
Enlist help from administrative support in contacting medical providers for medical records. This should speed up the initial visit for the evaluations by freeing up their time and allowing nurses more time to do other things that are needed to get the evaluation started/completed.
To achieve the goal stated above
From 2022-01-01 to 2022-12-31
What is the % of assessments that were started by the requested due date and how many were completed?
Monthly goals will be met.
1. Nurses review the patient chart and notify administrative support which medical providers they need medical records requested from. 2. Administrative support contacts the providers to request records and emails/forwards them to the nurses when received. 3. When evaluation is completed and chart turned into administrative support, the reference date (date of the visit) is documented. 4. At the end of the month a report is ran by administrative support and the #’s recorded, both of % of visits/assessments started by the due date, and quantity of assessments completed.
We will check to see if we met our goals after 3 months, 6 months and 9 months.